Update on Leased Property Progress, November 14, 2023

 

By now, most of you have seen two things working independently down from the PRS/ BPCR ranges. This is a summary update so you will know what is happening currently.

 

First, Nelson Tree Services has been clearing around electric power lines on the 1217 acres of leased property and NEKFGA’s 300+ acres. This will continue until done. Estimated completion is likely mid-December.

 

Second, engineering plans were approved for bulldozer work building a Loop Road, trailhead, parking, and construction staging area below/left of the PRS/BPCR ranges. Twelve cabins will be placed at the staging area or by Herb Ross Road this week and next in advance of infrastructure being available. All areas below the PRS/BPCR ranges are closed to NEKFGA. 

 

Third, environmental impact studies are underway which may take several months. Once those reports are finalized, the next step is to post bids. This may take an additional two to three months to complete.

 

Fourth, Herb Ross Road construction will come up towards the club-house area. NEKFGA will remove, then move the existing gate to the clubhouse 2.6-acre location to clear the right of way for a 24-foot im-proved, road meeting county standards up to Long Shot Road. From that intersection, Long Shot Road will be widened to 18-feet to des-cend and loop in accordance with county requirements and plans for the valley. Herb Ross Road will be closed at times during road con-struction. A passage will remain open for limited traffic as needed. Tree removal and excavation will happen. Road passage will resume for NEKFGA and ongoing construction traffic once the road is done.

 

Fifth, the cabins above will be pre-positioned for placement once wa-ter, sewer, and power is available. Water may come from Herb Ross Road, sewer and power lines will likely come from Ellington Run. Part of the Loop Road may also be used for RV, pop-ups, tent camp sites.

 

Sixth, current PRS/ BPCR activities on a planned weekend basis may continue unimpeded if possible. Scheduled Sporting Dogs April 13-14, 2024, Boy Scout Weekend, Friday, April 26, Saturday, April 27, and Sunday, April 28, 2024, and NEKFGA Open House, Saturday, May 4, 2024 9am-3pm were introduced in this planning to be held as planned.

 

Seventh, on leased property by the clubhouse, we have two small buildings holding target frames, clay birds, electronic trap equipment, two hand trap throwers, and feeders. All this will need to be moved to property we own soon since this is within the Loop Road construction zone.

 

Eighth, PRS/BPCR equipment, CONEX boxes, rails, targets, and cover will be relocated when we have property where we can reconstruct and install all of it. Our long-standing policy is to not build anything permanent unless we own the property. That is well understood and accepted.

 

Ninth, the underlying principle is NEKFGA and EKLD will continue to work cooperatively towards our mutual interests with our many overlaps. New accomodations will be a bonus as NEKFGA holds regional and/or national events. Working together inevitably gets better outcomes for all. We will update you as we know more. Thank you for continuing your membership and your ongoing interest in keeping NEKFGA strong.

 

Carl Beatty, NEKFGA President and Board of Directors